Piling productivity

Number of bored pile that can be installed per day

Pile diameter, or pile width, or sheet pile width
m
Pile length
m
Geotechnical conditions - SPT (N-value x 2) - blows/300mm **
kPa
Socket material strength of socket UCS(MPa) *
MPa
Engine (kw) or vibro weight(t) x 25
kw

Splicing time frames


Production rates relative to piling methodology Value Unit Concrete Unit
Bored Piles 0 no/shift 0 m3/day
Bored Piles with Casings 0 no/shift 0 m3/day
CFA Bored Piles 0 no/shift 0 m3/day
Driven H Piles 0 no/shift
Driven Tubes Piles with shoe 0 no/shift
Precast Concrete Piles 0 no/shift
Vibro Replacement 0 no/shift
Sheet Pile Wall 0 no/shift
Secant Pile Wall 0 no/shift 0 m3/day
Diaphragm Wall 30-50 m3/shift 30-50 m3/day
Soldier Pile Wall 0 no/shift
Contiguous Pile Wall 0 no/shift 0 m3/day
Soil Mix/Slurry Wall 100-160 m3/shift 100-160 m3/day
Drilling pile productivity only 0 m3/shift
Drilling socket productivity only 0 m3/shift