Construction Estimating

Oct 7

Written by:
10/7/2006 1:07 PM  RssIcon

What is an estimate? What is included in this estimate and where do these costs come from? Estimate - a list of material and other costs directly and indirectly associated with the construction of your home. Direct costs will be items such as lumber, concrete, and labor. These items are things that will be permanent fixtures in the home, or such things that will have been done to complete the construction.
What is an estimate? What is included in this estimate and where do these costs come from?

Estimate - a list of material and other costs directly and indirectly associated with the construction of your home.

Direct costs will be items such as lumber, concrete, and labor. These items are things that will be permanent fixtures in the home, or such things that will have been done to complete the construction.

Indirect costs will be items that the builder charges to keep the business running. Indirect costs can be broken down into overhead and profit. Profit is what the contractor charges for their knowledge, experience, and management ability. Overhead will pay for the contractors' phones, power for the office, office staff, payroll service, etc.

Advertise

Typically, a homeowner will have gone to an architect to design the plans or gotten them from a plan service. I suggest using an architect as they will help you make changes to the plan and can assist in advertising for bids. Often, when advertising for bids, a listing in the local newspaper will be sufficient, but if several contractors in the area are well known you may call them and ask if they would like to bid on the project. In my honest opinion, this is the best method. This will give you the option to choose whoever you want. Also ask them if they can fit you in their schedule, this is important due to the fact that if they have lots of work, they will bid higher to cover the extra costs they will incur to complete your home. The architect should also provide you with a base cost for the project that you can compare with the bids for accuracy. Do not, I repeat, DO NOT take the lowest bid just because it's the lowest.

Interviewing

After receiving the bids, pick several of them based on track record, cost, and professionalism and then interview with them, interview all of them if you have time. One point to remember in the bid sheet, do not stipulate when or how the bid will be awarded, instead state something to the effect of, "Bids will be opened on Month, Day, Year and bids will be awarded after an interview process has been completed." You can get some good ideas in differences of building techniques and design during the interviews. Many times a homeowner will just pick the lowest bidder and end up with someone that they are incompatible with. This is very important, if you can't deal with the contractor you will not have a pleasant experience during construction. Do not cull a bid because it is more expensive than the others, they may have seen a problem area that the others did not see and are covering for it. This will usually become apparent during the interview process.

Accuracy

Another item when comparing the bids, make sure the contractor has bid for what you wanted them to bid for? Did they include your Viking model cooktop or did they substitute it for a lesser model or brand? The problem that arises when substitutions are made that you were unaware of is a change order. Change orders make for bad business relationships. Don't get me wrong, there will always be change orders but they should be kept to a minimum. When substitutions are made the homeowner does not get an accurate estimate of final project cost, it will be a final project cost without all the change orders, which add up quickly. This is how many contractors get jobs, they bid the lowest quality items and then change order everything back up to the original product. They show you a very low cost but when it's all said and done you end up paying just as much as if you had taken the highest bidder.

More discussions can be found at the Construction Management Forums.

 UsersOnline
Minimize
Membership Membership:
Latest New User Latest: mgibbs1
Past 24 Hours Past 24 Hours: 2
Prev. 24 Hours Prev. 24 Hours: 5
User Count Overall: 11374

People Online People Online:
Visitors Visitors: 266
Members Members: 2
Total Total: 268

 New_Blog
Minimize
You must be logged in and have permission to create or edit a blog.
 Search_Blog
Minimize
 Blog_Archive
Minimize
Archive
<May 2012>
SunMonTueWedThuFriSat
293012345
6789101112
13141516171819
20212223242526
272829303112
3456789
Monthly
Go
 Recent_Comments
Minimize
Re: Database or spreadsheet. What’s the difference, anyway?
Good article. Changing to do these different formats can be intimidating, but they are easier to use than they might seem. And once you switch, you soon realize the new benefits as far as ease of use and ability. I agree that you just have to pick the type that fits your specific company.
Re: Database or spreadsheet. What’s the difference, anyway?
As a remodeling and home builder I need a detailed spread sheet. Especially in my labor costs on a particular project, where I have utilized either piece or hourly labor wages on different phases of construction. A good spread sheet can allow me to accurately calculate one way of building a home versus another. It also allows me to see where in a particular phase of construction where I might be loosing money, or improving my balance sheet. www.dimensionbuildlv.com
Re: Database or spreadsheet. What’s the difference, anyway?
As a Las Vegas Remodeling Contractor still using the old excel programs and hate them, need to upgrade to something better. Always have trouble with headings columns, or expanding the sheet you end up with problems sometimes. Anyway I still use a pencil from time to time. thanks for the article
Las Vegas Remodeling

www.dimensionbuildlv.com
Re: The art of construction estimating
I Like This Very Much
Re: Golf and Waterfront Real Estate
can i get the detailed amenities and specifications of any one waterfront and golf project?...
Re: The art of construction estimating
very good article, pl mail me details in PDF format
 Blog_Tags
Minimize
Home   |   Features   |   Products   |   Downloads   |   Articles   |   Support   |   About us   |   eConstruction   |   Production Rates   |   PM System   |   Careers   |   Building
Copyright 2005 by Methvin